Required power AC kWp

Calculate AC = DC
kWp
DC
kWp
 
Budget photovoltaic (MWp) EUR EUR
Item Action Design Unit Cost Cost
Land acquisition Ownership        
PROJECT - Engineering
Processing connectivity Request distribution      
  Request for consent to the placement case by case      
  Distribution connection charge case by case      
Territorial and construction management Project DUR 1MW
  Project SR   1MW    
  Study layout   1MW    
  Energy audit 1MW
  Connectivity study 1MW
  Expression institutions and respective authority case by case VD    
  Obtaining planning permission assistance case by case      
Negotiations with the bank financing Continuously  
Geodetic survey plots, networks and points of interest (geodetical and engineering work) Main 1MW
Project implementation electro I. High Voltage 1MW
Project implementation electro II. Medium and Low Voltage 1MW
Geodetic definition FVE (banches, lines, wiring, cabling)   1MW
Landscaping, excavation works Total hours 1M.hour
Fencing delivery approx height 2m (blade wire) 1m
  Assembly 1m
Entry gate 6000 mm   1 unit
Access road (paved) to the substation and transformers Labor, material, gravel, belts 100m
Excavation Approx, depending on terrain and technique used 100m
FRAME - construction
Construction - KRINNOR 6 x Horizontal save ground anchors + 150cm Delivery, components 1Wp
  Instalation under normal conditions (no rocks) 1Wp
  Cable mounting system 1MW
Lightning rod Project    
Dehn & Sehn Delivery 1MW
  Assembly 1MW
MODULES Phonosolar
  1Wp  
Modules Phonosolar PS 185M-24/F 1Wp  
 MODULES Phonosolar HEC+
LOW VOLTAGE COMPONENTS
Wires AC NYY-J 4X25 RM 100m
  NYY-J 4X35 SM 100m
  NYY-J 4X50 SM 100m
  NYY-J 4X70 SM 100m
  NYY-J 4X95 SM 100m
  NYY-J 4X120 SM 100m
  NYY-J 4X150 SM 100m
  NYY-J 4X185 SM 100m
  NYY-J 4X240 SM 100m
  Instalation 100m
Grounding wires Delivery 100m
  Instalation 1MW
Switchgear (MX Chassis) + certificates No of Units 1 unit
  1 unit
DC over voltage protection   1 unit
Switchgear (RM Chassis) + certificates No of Units 1 unit
  1 unit
DC CABLE ÖLFLEX 2,5 millimeters Solar 100m
DC CABLE ÖLFLEX 4 millimeters Solar 100m
DC CABLE ÖLFLEX 6 millimeters Solar 100m
DC CABLE ÖLFLEX 15 millimeters Solar 100m
DC CABLE ÖLFLEX 25 millimeters Solar 100m
DC CABLE ÖLFLEX 35 millimeters Solar 100m
Solar connectors MCT4 / Amphenol PLUS & MINUS poles   1 set
Copoflex Cable protection 100m
DC to AC inverters
Inverters SIEMENS 17K (16,5 ac / 18,1 Dcmax) 1 unit
Delivery / assembly 1 unit
Monitoring RefuLog/Siemens Cards, wires, connectors 1MW
  Assembly 1 unit
MX brackets for cabinets and the back deck of the inverter Delivery 1 unit
  Assembly 1 unit
Additional sensors to monitor Pyrometer, anemometer, ambient temperature and panels 1 unit
Inverters assembly and start up Involvement and recovery (AC and DC side)    
  Settings (the correct value) 1MW
GSM monitoring - central unit Setup and recovery 1 unit
Technological container (cell) Delivery 1 unit
  Delivery 1MW
active elements monitoring (webbox, routers, sensors ...) Assembly and set up 1MW
  Delivery 1MW
VPN channel encryption Assembly and set up 1MW
set up communications with the portal MQ1 Assembly and set up 1MW
establish a communication line (= inet connection FVE) Assembly and set up 1MW
control system FVE portal Assembly and set up 1MW
  Management unit  
Long distance control Assembly and set up 1MW
HIGH VOLTAGE COMPONENTS
Trafostation description AREVA / 1250 / xxx 1 unit
  Excavation and placing including technics 1 unit
  Connection 1MW
High Voltage cable connections Delivery 100m
  Excavation and laying, recovery 100m
Over Voltage protection Delievry (U/F) 1 unit
  Setting protections + protocol DS 1 unit
  Assembly 1 unit
Switchboard data (to technol.kont.) Delivery  
Geodetic surveying HV cable   1MW
Consultation with DS physical connection FVE    
Power Plant security
EZS - fence screened cable cable & management unit 100m
Perimeter Control Devide delivery and assembly 100m
Visual inspection CCTV - Cameras 100m (4cam)
Microwave Control Devide delivery and assembly 100m
License application assistance Negotiation, documents on the ERU 1MW
Service Contract Up on request    
PROJECT COMPLETION
Actual project implementation    
AD    
Final landscaping, green   case by case      
Engineering builder and techniques 1MW
Transport and site equipment, interpret, UMC, 4WD, etc.   1MW
Trial operation Tuning FVE 1MW
Total initial revision FVE 1MW
Insurance of construction activity   1MW
Contingency, margin, employees, additional transport 1MW
Phonosolar
TOTAL
  MWp AC 1 kWp
 
 
Phonosolar HEC+
TOTAL HEC+ modules
1 kWp
 

* Podle aktuálních kurzů ČNB ze dne 9.9.2010.


Required power AC kWp

Calculate AC = DC
kWp
DC
kWp
 
Budget photovoltaic (MWp) EUR EUR
Item Cost Cost
PROJECT - Engineering
FRAME - construction
MODULES Phonosolar
 MODULES Phonosolar HEC+
LOW VOLTAGE COMPONENTS
DC to AC inverters
HIGH VOLTAGE COMPONENTS
Power Plant security
License application assistance
Service Contract    
PROJECT COMPLETION
Phonosolar
TOTAL
  MWp AC 1 kWp
 
 
Phonosolar HEC+
TOTAL HEC+ modules
1 kWp
 

* Podle aktuálních kurzů ČNB ze dne 9.9.2010.


Rozměr střechy vodorovně(x): m
Rozměr střechy svisle(y): m
Celková výměra:
Plocha střešních oken, zastínění: m2
Využitelná plocha:
Lze umístit systém o výkonu:
Výše investice:
Roční výnos:Od
Do
Vliv sklonu a orientacevůči jihu (90° - východ, 180° - jih, 270° - západ)
Sklon (0-90°) °
Azimut (90-270°) °
Výkon
Roční zisk
Vaše cena silové energie:
Zelený bonus:
Přímý prodej:

Rozměr střechy (x): m
Rozměr střechy (y): m
Celková výměra:
Plocha střešních oken, světlíků, stínění: m2
Využitelná plocha:
Lze umístit systém o výkonu:
Výše investice:
Roční výnos:Od
Do
Roční zisk
Vaše cena silové energie:
Zelený bonus:
Přímý prodej: